Phillips Brooks House Weatherization

On May 2, 2010 more than 50 Harvard students took a break from studying for finals and picked up caulk guns to help improve the energy efficiency of the Phillips Brooks House in Harvard Yard.

LEED Rating System: LEED-NC

LEED Rating: GOLD

Date Completed: December, 2008

By choosing to reuse a significant portion of the existing building, selecting low flow water fixtures, specifying low emitting paints and materials, designing day-lit spaces, earning LEED...

Free LEDs from REP

Take these five actions to help reduce energy in your House or Dorm!

LEED Rating System: LEED-CI

LEED Rating: PLATINUM

Date Completed: January, 2009

The McCulloch Hall project was a 35,127 square foot renovation of a 53,235 square foot residence hall for 84 MBA students at the Harvard Business School in Boston, Massachusetts. The...

LEED Rating System: LEED-NC

LEED Rating: SILVER

Date Completed: August, 2006

Aldrich Hall is a 102,825 square foot classroom building serving the Harvard Business School's MBA program. The building, originally built in 1955, completed a three phase gut renovation in...

LEED Rating System: LEED-CI

LEED Rating: GOLD

Date Completed: December, 2010

North Hall was built in 1960 as a hotel. In 1988, Harvard Law School acquired North Hall with the intent to repurpose the hotel as student housing. Few changes to the original building were...